Brave Tern - Working on the edge (2) | Made in Germany

DW (English) 2014-09-24

Views 30

In our second episode, the offshore installation vessel BraveTern gets legs. As soon as it arrives at its Destination, the Global Tech One wind farm, it's jacked up on 60 meter self-elevating legs to give it stability in the North Sea. The jib crane can then lift the heavy components and installation of the wind farm's final two turbines can begin.

More from this edition of Made in Germany: http://www.dw.de/made-in-germany-the-business-magazine-2014-09-23/e-17881600-9798

Share This Video


Download

  
Report form