SPMT and PMLS Animation by Engineered Rigging

Eddy Kitchen 2015-10-13

Views 2

This project utilized both the PMLS and SPMT units to lift and install an RCP Motor in a Nuclear Power Plant. Note the fully loaded deck which secures the load above versus a suspended load below a hook. Contact [email protected] or visit us at www.EngineeredRigging.com

Share This Video


Download

  
Report form