Demolition of a group of high-rise flats did not entirely go to plan with two of the six blocks still partially upright and some residents unable to return to nearby .\r
\r
\r
\r
\r
\r
\r
\r
Controlled demolition of iconic Red road flats in Glasgow, demolition carried out by safedem The first demolition took place on 10 June 2012 with the destruction .