SEARCH
School building to be completed in 14 months
The Star
2018-04-12
Views
21
Description
Share / Embed
Download This Video
Report
Deputy education minister Datuk Chong Sin Woon said the building for SJK (C) Ladang Ulu Kanchong will be completed in 14 months.
Show more
Share This Video
facebook
google
twitter
linkedin
email
Video Link
Embed Video
<iframe width="600" height="350" src="https://vntv.net//embed/x6hoy64" frameborder="0" allowfullscreen></iframe>
Preview Player
Download
Report form
Reason
Your Email address
Submit
RELATED VIDEOS
00:57
School building to be completed in 14 months
01:12
Sukuk misuse case: Investigation to be completed within two months, says Azam Baki
01:01
Pupils in Langkawi glad to be back in school after months of home learning
04:35
Pfizer, AZ booster shots can be given at least three months after second dose, says Khairy
02:00
High-profile investigations to be wrapped up in six months, says Azam
04:05
RM1,500 minimum wage to be implemented in one or two months, says Saravanan
02:17
VEP installation to be delayed by at least six months
03:10
Arena Larkin Aquatic Centre to be closed for five months following E.coli contamination
00:57
SRC International trial witness: Govt guarantees normally take months to be approved
00:59
Thai bay from 'The Beach' to be shuttered for 4 months
03:43
AG:Equanimity can be sold within the next three or four months
04:41
Health DG: Covid-19 curve can be flattened in three to four months