SEARCH
DPWH: Konstruksyon ng BGC-Ortigas Link Bridge, 80% nang tapos
PTVPhilippines
2021-03-05
Views
6
Description
Share / Embed
Download This Video
Report
DPWH: Konstruksyon ng BGC-Ortigas Link Bridge, 80% nang tapos
Show more
Share This Video
facebook
google
twitter
linkedin
email
Video Link
Embed Video
<iframe width="600" height="350" src="https://vntv.net//embed/x7zpxvh" frameborder="0" allowfullscreen></iframe>
Preview Player
Download
Report form
Reason
Your Email address
Submit
RELATED VIDEOS
02:17
DPWH: Konstruksyon ng Skyway Stage 3, halos 90% nang tapos; naturang proyekto, inaasahang matatapos sa Disyembre
02:19
#SentroBalita | Konstruksyon ng BGC-Ortigas Link Bridge, 24/7 na
02:36
Kabuuan ng BGC-Ortigas Link bridge, matatapos na ngayong buwan ayon sa DPWH; Isyu ng credit grabbing, sinagot ni Sec. Mark Villar
02:09
DPWH conducts final inspection in BGC-Ortigas link bridge before its opening on June 12
00:48
DPWH eyes completion of BGC-Ortigas Link Bridge by end-September
02:27
Konstruksyon ng MRT-7, halos 45% nang tapos
00:50
Konstruksyon ng NLEX connector first segment, halos 50% nang tapos
01:47
GOV’T AT WORK: Konstruksyon ng Bicol Int’ Airport, higit 75% nang tapos; Pagpapabuti sa Enchanted River roads sa Hinatuan Surigao Del Sur, makakatulong sa ekonomiya at pamumuhay ng mga residente; MRT-3, may libreng sakay para sa mga kababaihan ngayong N
03:55
BGC-Ortigas Link Bridge, nakatakda nang buksan sa June; biyahe ng mga motorista, posibleng umikli ng 12 minuto
03:35
Konstruksyon ng bagong terminal ng Clark Airport, halos 70% nang tapos
00:56
Konstruksyon ng MRT-7, halos 50% nang tapos
02:08
#UlatBayan | GOVERNMENT AT WORK: Konstruksyon ng Bicol International Airport, higit 70% nang tapos