BGC-ORTIGAS CENTER ROAD LINK
This photo shows a portion of the Bonifacio Global City (BGC)-Ortigas Center road link project that connects the business hubs of Pasig and Taguig. The 1.481-kilometer road will be open to the public following its inauguration on Sept. 30, 2021. The road link is expected to reduce the one-hour travel time between BGC and Ortigas Center to only 12 minutes.
Photos by John Orven Verdote
Subscribe to The Manila Times Channel - https://tmt.ph/YTSubscribe
Visit our website at https://www.manilatimes.net
Follow us:
Facebook - https://tmt.ph/facebook
Instagram - https://tmt.ph/instagram
Twitter - https://tmt.ph/twitter
DailyMotion - https://tmt.ph/dailymotion
Subscribe to our Digital Edition - https://tmt.ph/digital
Check out our Podcasts:
Spotify - https://tmt.ph/spotify
Apple Podcasts - https://tmt.ph/applepodcasts
Amazon Music - https://tmt.ph/amazonmusic
Deezer: https://tmt.ph/deezer
Stitcher: https://tmt.ph/stitcher
Tune In: https://tmt.ph/tunein
Soundcloud: https://tmt.ph/soundcloud
#TheManilaTimes