SEARCH
The technical glitch in the Neelum Jhelum Hydropower Project could not be resolved even after a year
ARY NEWS
2023-06-21
Views
5
Description
Share / Embed
Download This Video
Report
The technical glitch in the Neelum Jhelum Hydropower Project could not be resolved even after a year
Show more
Share This Video
facebook
google
twitter
linkedin
email
Video Link
Embed Video
<iframe width="600" height="350" src="https://vntv.net//embed/x8lxcc6" frameborder="0" allowfullscreen></iframe>
Preview Player
Download
Report form
Reason
Your Email address
Submit
RELATED VIDEOS
01:13
The reason for technical failure in Neelum Jhelum Hydropower Project has came to light
02:33
Neelum Jhelum Hydropower Project
03:59
Neelum-Jhelum Hydropower Project short story in JAIZA
12:20
Neelum Jhelum Hydropower Project _ Dam,Tunnel,insi
00:54
Tensions Escalate: Indian Shelling Targets Neelum-Jhelum Hydropower Project in Azad Kashmir
06:32
Neelum Jhelum Hydropower Plant Pakistan
03:01
My report on Neelum–Jhelum Hydropower Plant
03:01
My report on Neelum–Jhelum Hydropower Plant
06:09
Neelum Jhelum Hydropower Project – 29 Dec 15 - 92 News HD
00:34
Five killed in accident at Neelum-Jhelum hydropower project
03:08:17
Ending metaphysics Mengbao returned to the cold wealthy family, transformed into a little sun loved by everyone, warmly shining on everyone, even the cold president Daddy was melted away, and the long-standing problems were easily resolved under her, not
02:24
The day when US wants Kashmir issue to be resolved, that day will be resolved: Shamshad Ahmed Khan