SEARCH
Bridge work is going on slowly, people come and go by crossing the tracks.
Patrika
2023-09-04
Views
2
Description
Share / Embed
Download This Video
Report
Bridge work is going on slowly, people come and go by crossing the tracks.
Show more
Share This Video
facebook
google
twitter
linkedin
email
Video Link
Embed Video
<iframe width="600" height="350" src="https://vntv.net//embed/x8npr20" frameborder="0" allowfullscreen></iframe>
Preview Player
Download
Report form
Reason
Your Email address
Submit
RELATED VIDEOS
00:19
Lift work slow at Narmadapuram railway station, passengers crossing the tracks
00:54
elephant lifts crossing gate to cross railway tracks
00:16
See here also sir! Desolate children's garden, due to non-construction of foot bridge, passengers cross the tracks and go to the platform every day
00:19
Railway station bridge work going on at a slow pace
01:49
Video Story: Father scolded for eating food slowly, angry youth climbed on high tension line tower
00:23
'Silica sand' will prevent train wheels from slipping on tracks
00:31
Japanese technology machine brought in railway to increase the life line of railway tracks
00:36
Human story - kept guarding the dead body till two and a half hours, walking a kilometer on the tracks and kept the dead body near the GRP
00:17
Recovered railway tracks
00:29
Devotees crossing the bridge dangerously in Omkareshwar
00:11
Due to heavy rain, the tracks were submerged up to half a foot
01:57
The surging river crossed with the help of the tracks on the mountain and came to vaccinate the forest dwellers