Celebratory ride for the bloor west bike infrastructure (includes extra timelapse from aberfoyal to runnymede)

Views 1

The timelapse function on the JVC Everio didn't get turned on due to a malfunction with the touch panel (resistive), as such, I speeded up the two clips to equal close enough to 1-5 fps (when normalised).
One of the speakers didn't press hard enough on the malfunctioning (momentary switch is worn) mic trigger, so I had to amplify the volume.
The high winds didn't make things any better.

Music composed for the two timelapses is my own.

Share This Video


Download

  
Report form
RELATED VIDEOS