Rescue Operations Are Still Going On To Evacuate The 41 Workers Trapped Inside The Under-Construction Tunnel In Uttarkashi, Uttarakhand. A Part Of The Tunnel Collapsed On November 12. Now, Vertical Drilling Is Being Done To Rescue The Workers. As Reported By ANI, 31 Metres Of Drilling Work Has Been Completed So Far Out Of The 86 Metres Needed To Reach The 41 Trapped Workers In The Silkyara Tunnel. Watch The Video To Know More.