SEARCH
The work of PM's residence being built near the vegetable market is incomplete.
Patrika
2024-03-24
Views
4
Description
Share / Embed
Download This Video
Report
The work of PM's residence being built near the vegetable market is incomplete.
Show more
Share This Video
facebook
google
twitter
linkedin
email
Video Link
Embed Video
<iframe width="600" height="350" src="https://vntv.net//embed/x8vk4ie" frameborder="0" allowfullscreen></iframe>
Preview Player
Download
Report form
Reason
Your Email address
Submit
RELATED VIDEOS
00:21
Wholesale vegetable market is being built, there will also be cold storage
00:10
Road was being built in place of the bridge being built at Sonasaanwari Railway Gate, the corporation stopped it.
00:10
Road was being built in place of the bridge being built at Sonasaanwari Railway Gate, the corporation stopped it.
00:14
The bridge built on the highway between Narmadapuram Itarsi lying incomplete
00:38
Unseasonal vegetables are being grown in modern and protected agriculture, farmers are being made aware
00:12
An iron net is being woven to erect the structure of the bridge being built at the railway gate.
01:04
Wholesale vegetable market in the rear of the market complex
00:09
Ban on collection of market fees from shopkeepers in vegetable market
00:51
Payment of MNREGA wages stuck, tap water scheme work incomplete for 5 years
00:50
Causeway overflow built near Bhadrakali temple, disaster relief team inspected the river area by boat
00:52
Residential girls school being built with Rs 4 crore 21 lakh
00:14
62 km two-lane road being built from Narmadapuram bypass to Pipariya with a cost of Rs 220 crore