SEARCH
The second structure of the bridge remains to be built, work on service road is also going on.
Patrika
2024-01-25
Views
9
Description
Share / Embed
Download This Video
Report
The second structure of the bridge remains to be built, work on service road is also going on.
Show more
Share This Video
facebook
google
twitter
linkedin
email
Video Link
Embed Video
<iframe width="600" height="350" src="https://vntv.net//embed/x8rs583" frameborder="0" allowfullscreen></iframe>
Preview Player
Download
Report form
Reason
Your Email address
Submit
RELATED VIDEOS
00:10
Road was being built in place of the bridge being built at Sonasaanwari Railway Gate, the corporation stopped it.
00:10
Road was being built in place of the bridge being built at Sonasaanwari Railway Gate, the corporation stopped it.
00:12
An iron net is being woven to erect the structure of the bridge being built at the railway gate.
00:06
Incidents happening every day on temporary road, construction work started for two years also stopped
00:19
Railway station bridge work going on at a slow pace
00:10
Bridge work is going on slowly, people come and go by crossing the tracks.
00:12
Railway is getting the work of bridge construction done at Sonasaanwari Railway Gate.Railway is getting the work of bridge construction done at Sonasaanwari Railway Gate.
00:21
Wholesale vegetable market is being built, there will also be cold storage
00:36
The structure of the temple, remains of parikrama and sanctum sanctorum were found during digging in the ground...watch video.
00:11
Mangla road widening opportunities are over, now 80 feet wide road will be built
00:11
Security with the help of bamboo and wood, pillars on the bridge also damaged
00:11
Security with the help of bamboo and wood, pillars on the bridge also damaged